H1 General
anthony.sanchez@LIGO.ORG - posted 16:34, Friday 22 May 2026 (90325)
Friday Ops shift report.

TITLE: 05/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Major work that was completed today: 
Gate Valve 7 is now repaired. 
L4Cs went insideHAM2 . 
Faroing yaw in the new beam splitter.
And Optics cleaning of CRS optics.
 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:42 FAC Kim LVEA N Technical cleaning & Resupply 16:03
15:04 VAC Jordan LVEA N Gate Valve work 18:34
15:04 BBSS Betsy LVEA N Working on BBSS 16:01
15:25 IAS Jason LVEA N Pitch and Yaw BBSS Faro work 18:56
15:39 IAS Ryan C LVEA N Helping Jason 19:27
15:47 SYS TJ LVEA N BnK work inside HAM2 17:48
15:55 VAC Jordan & Travis LVEA N Closing Gate Valve 8! 17:14
16:16 SPI Mitchell LVEA N Taking parts out and setting up for SPI work 18:14
16:19 FAC Randy LVEA near Clean rooms N Clean room inspections. 17:08
16:22 VAC Gerardo LVEA n Walking around checking on various Vac equipment 17:14
17:00 SYS Jim LVEA HAM2 N helping TJ with BnK work 17:48
17:07 BBSS Betsy LVEA N Working on the BBSS 19:26
17:26 ISS Keita LVEA HAM2 N Going to HAM2 to do some In chamber work 18:34
19:24 SPI Jeff Optics lab yes Working on the SPI Optics 22:24
19:34 VAC Jordan & Contractor LVEA N Gate valve 7 work 23:01
19:40 SEI Shoshanna H2 PSL N Cleaning Optics 22:40
19:42 VAC Travis LVEA N GateValve work 22:15
19:58 IAS Ryan C LVEA west bae N BBSS Faroing YAW 21:30
20:00 BBSS Besty LVEA West Bae N More BBSS work 21:30
20:03 VAC Gerardo LVEA n Gate Valve 7 work 23:01
20:22 SEI Jim & Mitchel LVEA HAM2 N Installing L4Cs 22:52
20:52 pcal tony PcalLab y testing new laser 21:46