Reports until 16:45, Wednesday 27 May 2026
H1 General
oli.patane@LIGO.ORG - posted 16:45, Wednesday 27 May 2026 (90361)
Ops DAY Shift End

TITLE: 05/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: LVEA is LASER SAFE
LOG:

Start Time System Name Location Lazer_Haz Task Time End
13:25 FAC Kim LVEA n Tech clean 13:38
14:38 FAC Kim LVEA n Tech clean 16:37
15:46 SUS Betsy LVEA n Checking out BBSS 15:57
15:49 SEI Jeff Optics lab y(local) SPI work, turn on the laser 15:55
16:08 IAS RyanC, Jason LVEA n BBSS FAROing 19:33
16:13 SUS Ibrahim LVEA n BBSS work 19:17
17:10 SEI Jim MER n Powering on HPI controllers 17:13
17:25 SUS Betsy LVEA n BBSS work 19:04
17:29 SPI Jeff, Jennie OpticsLab y(local) SPI work 19:29
17:52 SEI Jim, Shoshana H2 PSL n CRS build 19:33
18:39 VAC Jordan LVEA n Turning off bakeout 20:03
18:40 VAC Gerardo LVEA n Taking measurements 19:12
19:01   Richard LVEA n Making sure people are working 19:12
19:55 SEI Fil MER n HEPI controller electronics 00:28
20:18 VAC Travis MX, EX n Turbo pump tests 23:12
20:22 SUS Ibrahim, Betsy LVEA n BBSS work (Betsy out 23:24) 23:48
20:30 IAS Jason, RyanC LVEA n BBSS FAROing 23:51
20:36 FAC Randy LVEA n Moving railings 21:11
20:44 TCS Camilla LVEA n Grabbing stuff from TCS cabinets 20:49
20:57 VAC Jordan LVEA n Checking on RGA 21:07
20:59 SEI Jim, Shoshana H2 PSL n CRS work 22:58
22:52 VAC Jordan LVEA n RGA CP1 checks 22:56
23:12 SPI Jennie, Jim OpticsLab y(local) SPI dream team work 00:42