TITLE: 05/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 2mph Gusts, 0mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.29 μm/s
QUICK SUMMARY: Work continues today on the BBSS on the test stand and prep begins at HAM7 for doors to be removed next week. No alarms overnight, temperatures and dust counts looks good.