TITLE: 05/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Today, HAM7 was vented and most bolts removed from doors while beam alignment continued in HAMs 2 and 3. The LVEA remains Laser HAZARD.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:29 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | Ongoing |
| 14:41 | FAC | Randy | LVEA | - | Craning table to W-bay | 14:59 |
| 15:24 | VAC | Jordan | LVEA | - | Venting HAM7 | 17:59 |
| 15:36 | FAC | Kim | LVEA | - | Technical cleaning | 18:12 |
| 15:40 | SAF | Richard O. | Arms | - | Inspecting beam tube enclosure | 18:44 |
| 15:40 | VAC | Randy | LVEA | - | Venting HAM7 | 17:13 |
| 16:43 | ISC | Keita | LVEA | Y | HAM2 alignment | 19:25 |
| 17:11 | ISC | Jennie | LVEA | Y | HAM2 alignment | 19:24 |
| 17:48 | SPI | Jeff | Opt Lab | Local | SPI work | 18:13 |
| 18:47 | SEI | Shoshana | H2 PSL | - | CRS builds | 19:39 |
| 19:35 | VAC | Jordan, Randy | LVEA | - | Breaking bolts on HAM7 | 20:30 |
| 20:24 | ISC | Keita, Jennie | LVEA | Y | HAM2/3 alignment | 23:32 |
| 22:30 | EPO | Disha +2 | LVEA | - | Tour | 23:11 |
| 22:50 | VAC | Jordan | LVEA | - | Checking RGA bakeout | 22:56 |