Displaying report 1-1 of 1.
Reports until 16:34, Friday 29 May 2026
LHO General
ryan.short@LIGO.ORG - posted 16:34, Friday 29 May 2026 (90383)
Ops Day Shift Summary

TITLE: 05/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Today, HAM7 was vented and most bolts removed from doors while beam alignment continued in HAMs 2 and 3. The LVEA remains Laser HAZARD.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:29 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD Ongoing
14:41 FAC Randy LVEA - Craning table to W-bay 14:59
15:24 VAC Jordan LVEA - Venting HAM7 17:59
15:36 FAC Kim LVEA - Technical cleaning 18:12
15:40 SAF Richard O. Arms - Inspecting beam tube enclosure 18:44
15:40 VAC Randy LVEA - Venting HAM7 17:13
16:43 ISC Keita LVEA Y HAM2 alignment 19:25
17:11 ISC Jennie LVEA Y HAM2 alignment 19:24
17:48 SPI Jeff Opt Lab Local SPI work 18:13
18:47 SEI Shoshana H2 PSL - CRS builds 19:39
19:35 VAC Jordan, Randy LVEA - Breaking bolts on HAM7 20:30
20:24 ISC Keita, Jennie LVEA Y HAM2/3 alignment 23:32
22:30 EPO Disha +2 LVEA - Tour 23:11
22:50 VAC Jordan LVEA - Checking RGA bakeout 22:56
Displaying report 1-1 of 1.