Reports until 11:41, Monday 01 June 2026
H1 CDS
david.barker@LIGO.ORG - posted 11:41, Monday 01 June 2026 (90414)
CDS Recovery Status

All CDS systems have been recovered with the exception of EY dust monitor. The EY Comtrol serial-to-ethernet is not working, Erik is replacing its power supply.

Erik started the HWS code. At EX he powered up the h1cdsrfm expansion chassis and power cycled the BRS_EX. At EY he powered the expansion chassis.

We started h1cdsrfm which has cleared all the long-range-dolphin IPC errors. EY WAP just needed powering up via the Pulizzi.

Patrick started the code on the Beckhoff systems for CHILLER_CS, CHILLER_EX, BRS_EX, BRS_EY, NCALX and  MAINS_EX.

EDC is currently down to 16 disconnected channels, all EY_DUST.