All CDS systems have been recovered with the exception of EY dust monitor. The EY Comtrol serial-to-ethernet is not working, Erik is replacing its power supply.
Erik started the HWS code. At EX he powered up the h1cdsrfm expansion chassis and power cycled the BRS_EX. At EY he powered the expansion chassis.
We started h1cdsrfm which has cleared all the long-range-dolphin IPC errors. EY WAP just needed powering up via the Pulizzi.
Patrick started the code on the Beckhoff systems for CHILLER_CS, CHILLER_EX, BRS_EX, BRS_EY, NCALX and MAINS_EX.
EDC is currently down to 16 disconnected channels, all EY_DUST.