ryan.short@LIGO.ORG - posted 16:35, Monday 01 June 2026 (90424)
Ops Day Shift Summary

TITLE: 06/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Very busy day with lots of visitors on site! Essentially everything was recovered following the weekend power outage, doors on HAM7 were removed and SQZ work in the chamber started after the ISI was locked, QOSEM work continued on the BBSS, the ISI was balanced on the test stand, prep began for the ITM cage baffle installation, GV7 was cycled and left closed for venting of the X-manifold, more beam alignment went on in HAMs 2 and 3, turbopumps at EY and MY were tested, FARO surveying began in HAM3, CRS building continued, and SPI work in the optics lab is ongoing. The EDC is still showing several disconnected channels, some of which relate to EY dust monitors.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:29 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD 17:21
14:36 FAC Kim LVEA - Technical cleaning 17:01
14:43 FAC Randy LVEA - Prep for HAM7 doors 15:12
15:01 VAC Jordan LVEA - Checking pumps 15:10
15:37 SPI Jeff Opt Lab Local Turning on laser 17:00
15:38 IAS Ryan C LVEA - Checking on FARO 15:47
15:46 ISC Keita LVEA - Opening light pipe 15:48
15:46 VAC Jordan MY, EY - Turbopump checks 16:40
16:04 PSL Jason LVEA - Powering on PSL CB2 16:22
16:19 VAC Travis Lvea - HAM7 door prep 16:25
16:28 SAF Ibrahim LVEA - Transition to SAFE 17:21
16:54 SUS Oli, Tom LVEA - BBSS QOSEM 18:19
17:21 SUS Ibrahim LVEA - BBSS work 18:19
17:22 FAC Randy LVEA - HAM7 door removal 19:22
17:22 VAC Travis, Jordan LVEA - HAM7 door removal 18:40
17:22 FAC Kim EX, EY - Technical cleaning 18:19
17:24 CDS Erik EY, EX - Power outage recovery 18:27
17:29 VAC Gerardo LVEA - HAM7 door removal 18:41
17:33 SLiC Mitch, Anamaria LVEA - Baffle install planning 17:46
17:38 SPI Corey Opt Lab - Optic cleaning 19:46
18:15 IAS Jason, Ryan C LVEA - FARO surveying HAM3 20:33
19:04 SAF Sheila LVEA YES Transition to Laser HAZARD 19:26
19:09 TCS Camilla MER - Turning on TCS chillers 19:25
19:26 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD Ongoing
19:27 SEI Shoshana, Arnaud H2 PSL - CRS builds 19:53
19:34 SEI Jim LVEA - Locking HAM7 ISI 19:54
19:55 SEI Jim EX, EY - Bringing up HEPI 20:33
20:13 SPI Jeff, Sina Opt Lab Local SPI alignment 22:04
20:24 VAC Jordan, Jake, Owen EY, MY - Shutting down turbopumps 21:20
20:33 ISC Marc, Keita CER - PZT power supply 20:37
20:50 SLiC Betsy, Anamaria LVEA - Staging for baffle install (Anamaria out @ 23:04) Ongoing
20:59 SEI Jim, Ibrahim LVEA - BBSS ISI balancing Ongoing
21:08 VAC Travis, Gerardo LVEA - X-man vent and open GV2 (Gerardo out @ 23:03) Ongoing
21:24 VAC Jordan, Jake, Owen LVEA - X-man vent and open GV2 22:18
21:28 SEI Marc, Patrick MER - HEPI electronics 21:58
21:30 SQZ Sheila, Camilla LVEA Y HAM7 SQZ beam hunting (Camilla out @ 22:58) Ongoing
21:38 IAS Jason, Ryan C LVEA - FARO surveying HAM3 Ongoing
21:58 ISC Keita, Rahul, Disha LVEA Y HAM2/3 beam alignment Ongoing
22:04 SEI Arnaud, Shoshana, Alex H2 PSL - CRS builds (Alex out @ 23:11) Ongoing
22:32 VAC Jordan, Jake, Owen LVEA - Venting X-manifold Ongoing
22:35 SPI Jeff, Sina Opt Lab Local SPI alignment (Jeff out @ 23:05) Ongoing
23:18 AOS Mitchell LVEA - Delivering garb Ongoing