Reports until 07:30, Tuesday 02 June 2026
H1 General
ryan.crouch@LIGO.ORG - posted 07:30, Tuesday 02 June 2026 - last comment - 10:57, Tuesday 02 June 2026(90434)
OPS Tuesday Day shift start

TITLE: 06/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 8mph Gusts, 4mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.14 μm/s 
QUICK SUMMARY:

Comments related to this report
ryan.crouch@LIGO.ORG - 08:15, Tuesday 02 June 2026 (90435)

A ~2 week trend of the LVEA temperatures.

Images attached to this comment
corey.gray@LIGO.ORG - 10:57, Tuesday 02 June 2026 (90437)

1610-1756 Covering Ops while RyanC does morning FARO work, and then handing off to TJ.

Have had a few connection drops for the EY Dust Monitor

LOG:

  • 1611 Ryan joining Jason for MC2 FAROing
  • 1615 VAC team:  XBM venting + GV2 opening (travis,gerardo,jordan)
  • 1617 Randy out
  • 1623 Kim out of lvea for quick break.
    • 1653 heading back to LVEA for cleaning around mega cleanroom
  • 1623 baffle prep @BSC1 (betsy.ryanS)
  • 1631 ham7 sqz (sheila, begum)
    • 1640 camilla joining
  • 1632 HEPI Pump station @lvea pressing RESET button, and then moving on to CRS (jim)
  • 1640 SPI work (sina, jennie, jeff)
  • 1640 CRS team (shoshonna, jim, alexandra, arnaud)
  • 1644 BBSS test stand (ibrahim)
    • 1654 tom joining, 1724 ollie joining
  • 1703-1732 Removing lighting on BSC platform (randy)
  • 1716 BSC1 baffling team (anamaria.robert)
  • 1716 Chris & Pest Control done (found lots of snakes...3 live ones released to desert).
  • 1724 Have had EY disconnects which alarm the Dust Monitors.
  • 1734 Joining VAC team (jordan.jake (new intern).owen(new intern)