TITLE: 06/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: HAM3 FAROing finished, HAM2, BBS, and SPI work continue. The LVEA is in LASER HAZARD.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 19:26 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 21:23 |
| 14:54 | FAC | Kim | LVEA | Y | Tech clean | 17:34 |
| 15:08 | FAC | Randy | EndX | N | Engine hoist inspection | 15:54 |
| 15:51 | FAC | Chris | LVEA | Y | PEst contractor walkthrough | 16:03 |
| 15:55 | FAC | Randy | LVEA | Y | remove lights @bsc platform | 17:36 |
| 15:57 | FAC | Keita, Rahul, Disha | LVEA | Y | HAM2 work | 19:14 |
| 16:04 | FAC | Chris | Out Bldgs | - | Pest control | 17:17 |
| 16:05 | IAS | Jason, RyanC | LVEA | Y | MC2 FAROing | 18:39 |
| 16:15 | vac | travis.gerardo.jordan.jake.owen | lvea | - | XBeamMani VENT | 18:32 |
| 16:15 | vac | travis.gerardo.jordan.jake.owen | lvea | - | GV2 OPENING (Gerardo out @1833) | 18:42 |
| 16:26 | SLiC | betsy.ryanS.anamaria.robert | lvea | Y | baffle prep at bsc1 (Betsy out @1900) | 20:17 |
| 16:43 | CRS | shoshana.jim.alexandra | h2psl | - | CRS | 19:22 |
| 16:43 | SPI | jeff.jennie.sina | OpticsLab | yes | SPI (Jennie, Sina out @1939) Jennie back in 20:45 | 21:32 |
| 16:45 | bbss | ibrahim.tom.ollie | West Bay | - | Test stand work | 19:17 |
| 16:46 | sqz | sheila.begum.camilla | lvea | yes | HAM7 SQZ (Sheila, Begum out @1913) | 19:28 |
| 18:39 | CC | Ryan C | LVEA | Y | Checking on HAM7 dust monitor | 19:24 |
| 18:49 | CDS | Fil | LVEA | yes | Troubleshooting FC1, swap DAC card | 20:45 |
| 20:13 | SUS | Betsy, Tom, Oli | LVEA | Y | BBSS test stand cabling, Oli in @ 20:42, Tom out 20:58, Oli out 21:02 | 22:12 |
| 20:20 | VAC | Travis | LVEA | Y | Gatevalve BTmanifold swap | 21:35 |
| 20:28 | SUS | Mitch | LVEA | Y | Test stand work | 22:45 |
| 20:35 | VAC | Gerardo | Yend | n | Grab tools | 21:13 |
| 20:36 | SUS | Ibrahim | LVEA | Y | Join Mitch, test stand bbs | 22:45 |
| 20:37 | SEI | Jim, Shoshana, Alexandra, Arnaud | LVEA, H2 PSL | Y | CRS work, Arnaud in @ 21:20 | Ongoing |
| 20:59 | OPS | TJ | LVEA | Y -> N | LASER hazard transition | 21:27 |
| 21:12 | SQZ | Camilla, Arnaud | LVEA | Y | Grab power meter | 21:20 |
| 21:28 | FAC | Richard | LVEA | N | Safety checks | 21:43 |
| 21:31 | SEI | Jim | LVEA | no | Lock BSC3 ISI | 21:51 |
| 21:33 | SPI | Jennie | LVEA | N | Check test stand for allen key | 21:42 |
| 21:41 | SUS | Jeff, Sina | LVEA | n | Looking at BBS | 22:00 |
| 21:43 | SLiC | Robert, Anamaria, Ryan S | LVEA | Y | BSC SLiC baffling | Ongoing |
| 21:48 | OPS | TJ | LVEA | N | Check with Jim, laser transition | 22:03 |
| 22:00 | SUS | Disha, Rahul, Keita | LVEA | Y | HAM2 work, Disha Keita out at 23:17 | 23:19 |
| 22:01 | SQZ | Sheila | LVEA | Y | HAM7 work | Ongoing |
| 22:06 | SQZ | Camilla | LVEA | Y | HAM7 work | Ongoing |
| 22:09 | SAF | LASER HAZARD | LVEA | Y | The LVEA is LASER HAZARD | 02:09 |
| 22:15 | VAC | Travis, Gerardo | LVEA | Y | Survey viewports, travis out 22:50 | 23:15 |
| 22:26 | PEM | TJ | Ends | N | Check on dust monitor pumps | 23:04 |
| 22:27 | SPI | Sina | Optics lab | LOCAL | SPI work | 23:27 |
| 22:46 | H2PSL | Fil | H2PSL | Y | h2psl work | 23:30 |
| 22:47 | SLIC | Jennie W | BSC2 | Yes | batteries | 22:48 |