Reports until 07:32, Thursday 04 June 2026
H1 General
oli.patane@LIGO.ORG - posted 07:32, Thursday 04 June 2026 (90477)
Ops DAY Shift Start

TITLE: 06/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 8mph Gusts, 4mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.13 μm/s 
QUICK SUMMARY:

BSC2 cartridge will be flying back in after lunch today! The LVEA will be going to LASER SAFE soon but is currently still LASER HAZARD