Ibrahim, Oli, Thomas, Betsy, Jim, Mitchell
- ISI rebalancing masses
- BBSS stages locked
- General torque checks done
- BRD Measurements re-taken - these were too noisy so will re-re-take in-chamber
- Some cabling done
- Face sheilds secured for cartridge
- Earthquake stop replaced (glass on fluorel tip was chipped)
- Calibrate BOSEM vs QOSEM vs Slider Values
- BBSS covered for cartridge flight