TITLE: 06/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
The LVEA is LASER HAZARD
BSC2 cartridge flown from test stand and into BSC2 DONE
SPI PSL pickoff shutter installed DONE
HAM2 B+K measurement DONE
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:28 | FAC | Kim | LVEA | n | Tech clean + restocking garb | 15:38 |
| 14:50 | Betsy | LVEA | YES | Gathering headsets | 15:04 | |
| 15:05 | SAF | Betsy | LVEA | YES | Transitioning LVEA to LASER SAFE | 15:20 |
| 15:37 | Betsy | LVEA | n | Looking for mic box | 15:49 | |
| 16:07 | EE | Fil, Richard | LVEA | n | Looking at 24V (Richard out 16:36) | 17:59 |
| 16:08 | SEI | Jim, Shoshana | LVEA | n | Test stand ISI cabling (Shoshana out 17:09) | 18:00 |
| 16:12 | FAC | Kim | LVEA | n | Tech clean + restock | 17:14 |
| 16:35 | SEI | Mitchell, Arnaud | MY | n | Shopping for cables | 17:06 |
| 16:45 | SUS | Betsy | LVEA | n | Test stand work | 18:04 |
| 16:49 | Richard | LVEA | n | Knocking ladder out from under Fil | 17:34 | |
| 17:21 | Tom, Radhika | LVEA | n | Tour | 18:15 | |
| 17:25 | Mitchell | LVEA | n | Putting stuff away in mega cleanroom | 17:32 | |
| 17:26 | FAC | Randy | LVEA | n | Prepping for craning | 18:56 |
| 17:31 | FAC | Kim | LVEA | n | Tech clean | 17:59 |
| 17:47 | SEI | Arnaud, Shoshana, Alex | H2 PSL | n | CRS work (Alex out 19:15) | 20:37 |
| 18:00 | EE | Fil | LVEA | n | Cabling | 20:01 |
| 18:00 | SEI | JIm | LVEA | n | Test stand SEI cabling | 18:04 |
| 19:24 | SPI | TJ, Jeff | LVEA | n | HAM2 B+K measurements (TJ out 21:53) | 21:59 |
| 19:39 | FAC | Randy | LVEA | n | Cartridge craning | 21:39 |
| 19:42 | Rahul | LVEA | n | Looking for socket wrench head | 19:56 | |
| 19:54 | Corey | LVEA | n | Filming cartridge install | 22:15 | |
| 19:56 | SUS/ISI | Betsy, Jim, Jordan, Ibrahim, Mitchell, Travis, Danny | LVEA | n | Cartridge flight (Mitchell out 21:56)(Danny,Travis out 22:03)(Jordan out 22:05) | 22:07 |
| 20:07 | FAC | Gerardo, Travis, Tyler | LVEA | n | Cartridge install | 21:37 |
| 20:28 | CRS | Alex | H2 PSL | n | CRS work | 20:37 |
| 20:33 | PSL | Jason, RyanS | LVEA | n | Installing SPI shutter in PSL enclosure | 22:04 |
| 22:15 | EE | Fil | LVEA | YES | CS HEPI pump controller work | 23:08 |
| 22:20 | CRS | Shoshana | H2 PSL | y(local) | CRS work | 00:20 |
| 22:36 | CRS | Arnaud, Alex | H2 PSL | y(local) | CRS work | 00:06 |
| 22:36 | SAF | Camilla | LVEA | YES | Transitioning LVEA to LASER HAZARD | 22:48 |