oli.patane@LIGO.ORG - posted 16:31, Thursday 04 June 2026 (90488)
Ops DAY Shift End

TITLE: 06/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

The LVEA is LASER HAZARD

BSC2 cartridge flown from test stand and into BSC2 DONE
SPI PSL pickoff shutter installed DONE
HAM2 B+K measurement DONE


LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

Start Time System Name Location Lazer_Haz Task Time End
14:28 FAC Kim LVEA n Tech clean + restocking garb 15:38
14:50   Betsy LVEA YES Gathering headsets 15:04
15:05 SAF Betsy LVEA YES Transitioning LVEA to LASER SAFE 15:20
15:37   Betsy LVEA n Looking for mic box 15:49
16:07 EE Fil, Richard LVEA n Looking at 24V (Richard out 16:36) 17:59
16:08 SEI Jim, Shoshana LVEA n Test stand ISI cabling (Shoshana out 17:09) 18:00
16:12 FAC Kim LVEA n Tech clean + restock 17:14
16:35 SEI Mitchell, Arnaud MY n Shopping for cables 17:06
16:45 SUS Betsy LVEA n Test stand work 18:04
16:49   Richard LVEA n Knocking ladder out from under Fil 17:34
17:21   Tom, Radhika LVEA n Tour 18:15
17:25   Mitchell LVEA n Putting stuff away in mega cleanroom 17:32
17:26 FAC Randy LVEA n Prepping for craning 18:56
17:31 FAC Kim LVEA n Tech clean 17:59
17:47 SEI Arnaud, Shoshana, Alex H2 PSL n CRS work (Alex out 19:15) 20:37
18:00 EE Fil LVEA n Cabling 20:01
18:00 SEI JIm LVEA n Test stand SEI cabling 18:04
19:24 SPI TJ, Jeff LVEA n HAM2 B+K measurements (TJ out 21:53) 21:59
19:39 FAC Randy LVEA n Cartridge craning 21:39
19:42   Rahul LVEA n Looking for socket wrench head 19:56
19:54   Corey LVEA n Filming cartridge install 22:15
19:56 SUS/ISI Betsy, Jim, Jordan, Ibrahim, Mitchell, Travis, Danny LVEA n Cartridge flight (Mitchell out 21:56)(Danny,Travis out 22:03)(Jordan out 22:05) 22:07
20:07 FAC Gerardo, Travis, Tyler LVEA n Cartridge install 21:37
20:28 CRS Alex H2 PSL n CRS work 20:37
20:33 PSL Jason, RyanS LVEA n Installing SPI shutter in PSL enclosure 22:04
22:15 EE Fil LVEA YES CS HEPI pump controller work 23:08
22:20 CRS Shoshana H2 PSL y(local) CRS work 00:20
22:36 CRS Arnaud, Alex H2 PSL y(local) CRS work 00:06
22:36 SAF Camilla LVEA YES Transitioning LVEA to LASER HAZARD 22:48