TITLE: 06/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
ISS PD Array alignment was most of the day and there was several activities in BSC1+2+3, as well as work in the CRS lab, @HAM7, and brief SPI feedthru work at HAM3
LOG:
- 1415-1501 Moving ISC Table & garb room @HAM3 (randy)
- 1442-1758 technical cleaning/organizing in lvea (kim)
- Came out for lunch break
- 1646-1758 Back for another hr to finish lvea
- 1525 Power cycle purge air (dew point is high) [gerardo]
- 1539-1543 Look at HAM2 & opening light pipe (keita)
- 1614-1753 HAM7 in-chamber (camilla, begum)
- 1653 out for break
- 1829-1957 Back to HAM7
- 1957 lunch
- 1615 B&K organizing (tj)
- 1641 TJ out briefly to chat with ibrahim but back in shortly after
- 1642 Annamaria working with TJ
- 1642 Ibrahim working with TJ + First Contact staging + ITMx baffle prep
- 1816 robert joining
- 1620 ISS PD Array alignment (rahul.dishal.keita)
- 1705-1710 Megacleanroom visit (mitch)
- 1722-1752 Dewpoint measurements in the lvea (gerardo)
- 1736-2003 Cyllindrical Rotation Sensor (CRS) team at the CRS Room (jim.shoshanna.alexandra)
- 1838 Arnaud joining
- 2003 out for lunch.
- 1838-1902 Optic Lab tour (jason.visiting postdoc)
- 1843 Betsy heading out to beer garden
- 1845 BSC3 ITMx measaurements (robert.anamaria)
- 1905 ETMx transfer functions (oli)
- during my lunch:
- 1927-2037 SPI feedthru swap (jeff.jennie.jim)
- 1938 tour (maggie)
- 1946-2133 Boxing up old BS suspension (randy.betsy)
- 2131 Betsy out. BS in box, but needs brackets to put on lid.
- 2020-2030 Running tools out to SPI
- 2025-2032 Tried to got to SUSR2 rack (josh)
- 2038 CRS work continues (alexandra, shoshanna)
- 2200 joining CRS team (arnaud.jim)
- 2058 ISS team returning for alignment work (keita.rahul.disha)
- 2224 Jennie tagging rahul out (he left at 2258)
- 2115-ish - 2313 SQZ team at HAM7 (camilla, begum, ryosuke)
- 2201-2313 Maddi joining SQZ team, laptop in-hand
- 2123 Cameras for BS went down briefly
- 2203-2222 FARO set-up for Mon (jason)
- 2231 staging parts in beer garden (anamaria, ibrahim)
- 2235-2238 Ran cable out to SQZ (corey)