Reports until 17:15, Friday 05 June 2026
H1 AOS (AOS, SUS, SYS)
anamaria.effler@LIGO.ORG - posted 17:15, Friday 05 June 2026 (90513)
Cage baffle install complete on ITMX

Robert, Ibrahim, Anamaria

We finished alignment of the CP cage baffle on ITMX, which was the last item to do regarding cage baffles. The panels are locked so they can now be removed and replaced while retaining the alignment. 

Both ITMs have the (new) face shield on. ITMY suspension is unlocked and ITMX is locked.