TITLE: 06/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 3mph Gusts, 1mph 3min avg
Primary useism: 0.04 μm/s
Secondary useism: 0.08 μm/s
QUICK SUMMARY:
Lots of items today: Continue finishing up ISS PD Array aligningment (then ground loop checks?), HAM3 SPI cabling/flange work + SPI main install, FARO for BBSS around HAM3, ITMy First Contact in-situ, HAM7 in-chamber.
Big M7.8 EQ ~15hrs ago (nothing tripped...although we have lots of SEI +SUS down for in-chamber work).
CEBEX crew continues laying brick (seeing about wall of 5-7 brick high this morning).