corey.gray@LIGO.ORG - posted 07:43, Monday 08 June 2026 (90520)
Mon Day Ops Transition

TITLE: 06/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 3mph Gusts, 1mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.08 μm/s 
QUICK SUMMARY:

Lots of items today:  Continue finishing up ISS PD Array aligningment (then ground loop checks?), HAM3 SPI cabling/flange work + SPI main install, FARO for BBSS around HAM3, ITMy First Contact in-situ, HAM7 in-chamber.

Big M7.8 EQ ~15hrs ago (nothing tripped...although we have lots of SEI +SUS down for in-chamber work).

CEBEX crew continues laying brick (seeing about wall of 5-7 brick high this morning).