TITLE: 06/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
ISS PD Array alignment continued, ITMy First Contact prep (for 3hr First-Contact-ing tomorrow), some FARO work for BBSS, cabling in BSC2, etc.
LOG:
- 1415-1542 technical cleaning in LVEA (kim)
- 1440-1535 Boxing up BS in West Bay (randy)
- 1517-1550 Check on randy (betsy)
- 1535-1907 Set-up for ITMy First Contacting (anamaria)
- 1539-1616 BS boxing completed (randy)
- 1622-1710 Technical cleaning in lvea cont. (kim)
- 1622-1624 grabbing cds laptop
- 1643-1907 Prep for ITMy First Contact-ing (ibrahim)
- 1705-1754 IM2 check at HAM2 (rahul)
- 1707-1925 HAM7 in-chamber (sheila.begum.camilla)
- 1716-1930 FARO set up @HAM3 (jason.ryanC)
- 1721 Inspection @CEBEX (Aegus truck let in at gate)
- 1723-1840 Craning around bsc2 (randy)
- 1725-1859 BSC2 in-chamber work (betsy)
- 1732-1957 BSC2 in-chamber (oli)
- 1732-1903 Craning stuff around bsc2 (mitch.jim)
- 1839 Mitch out, 1903 Jim out
- 1736-1957 BSC2 in-chamber (tony)
- 1739-1927 CRS lab work (alex)
- 1745-1751 rga bakeout check + vac walkabout (jordan)
- 1745-1802 garb checks & restarted dustmonitors in mega-cleanroom (kim)
- 1751-1927 CRS lab work (shoshonna)
- 1754 spi cabling (fil.jeff)
- 1850 jeff out
- 1856 fil out
- 1802 cement truck for cebex
- 1804-1912 Opening lightpipe + JAC table work (jennie.maddi)
- 1805-1813 pump cart check (travis)
- 1808-1845 Back for IM2 checks at HAM2 (rahul)
- 1809 M6.1 Cuba EQ
- 1846-1856 lvea walkabout (richard)
- 2000-2009 Moving laser safety panels to East Bay
- 2009-2020 rga bakeout check + vac walkabout (jordan)
- 2020-2050 Drive to CEBEX & EY (mike)
- 2021 CRS w/ laser hazard late afternoon (shoshonna)
- 2022 Back to BSC1 for First Contact prep (anamaria)
- 2025-2156 BBSS stay install (betsy.travis)
- 2025 ISS crew continues (keita.disha.rahul)
- 2026 HAM7 in-chamber & possibly set-up bifurcated area (begum.camilla)
- 2029-2100 HAM3 parts search (jeff)
- 2036-2226 Cable work upstairs at BSC2 (jim)
- 2039-2234 FARO set up @HAM3 (jason.ryanC)
- 2052 ITMy SW watchdog tripped
- 2107-2116 Photos at HAM3 (jeff)
- 2157-2208 Assisting w/ laser curtain set-up in East Bay (travis)
- 2250 Joining CRS (jim)
- 2258 rack checks/work (susr2) [betsy.oli]
- 2326 CER check (dave)