H1 COC (COC, SUS, SYS)
anamaria.effler@LIGO.ORG - posted 12:30, Monday 08 June 2026 - last comment - 16:34, Tuesday 09 June 2026(90526)
ITMY First Contact prep

Ibrahim, Anamaria

This morning we:
-  set up the FC fabric on the drum;
- lowered the ITMX ACB to take its wedge, and then used it to swing the ITMY ACB out of the way;
- inserted the peek "Kurt fingers" between ITMY and its CP in preparation for installing the FC jig this afternoon.

This afternoon we:
- set up the jig around the test mass;
- tightened the drum with the fabric onto the test mass while watching the fibers on camera;
- added the grid+mesh for pressing, as well as picos on the ring of the drum;
- added the funnel and hose setup, connected to the spigot.

We will add more details and photos later. For now we are dumping photos in the common FC google drive. Folders named by date and activity.