TITLE: 06/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 28mph Gusts, 21mph 3min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY:
BBSS in-chamber + SEI work is in full swing, ITMy in-chamber First Contacting this morning, ISS PD Array alignment continues, CRS work continues, HAM7 in-chamber work for SQZ, and SPI is on deck at HAM3. CEBEX has brick walls which look over 10'.
Have had a windy morning with starting at around 2am locally and gusts up to 45mph.