H1 SPI (SPI)
joshua.freed@LIGO.ORG - posted 17:34, Tuesday 09 June 2026 (90558)
SPI, ISIK Install Day 1

J. Freed, J. Kissel, J. Wright, T. Sadecki

Today was the first day of ISIK Install. ISIK IS NOW IN CHAMBER!!!! Detailed notes for the install are located here

Removed the last cable clamp of the old feedthrough from the -x -y corner. Feedthrough hole covered with foil in prep to install new feedthrough tomorrow which will include the fibre routing and existing ISI cabling.

In order we did:


NB we might have to realign M_B1 and R_B2 as these mounts were bumped in install

Images attached to this report