Ibrahim, Ryan, Betsy, Anamaria
This morning we poured the first contact onto ITMY. All went well. We had 3 minor drops at the bottom, but they dried fast and didn't continue leaking. We finished pouring about 09:35, took some 10 min. We then kept pushing the pico motors until the level stopped changing and the picos started to bottom out.
It took us a bit to get the camera setup with reasonable lighting, so for next time: we should turn off the illuminator from the getgo and set up a tripod just for light, next to the camera. (Because of the CP, we are looking through 3 surfaces to see the HR of the test mass so it's quite hard to not have all the reflections cover what we really want to monitor.)