TITLE: 06/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 3mph Gusts, 1mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
Expected work today:
SPI crew is out, and laser safe.
More BSC2 HEPI actuator work.
Final ISI unlock perhaps?
CRS Chamber side testing?
BSC2 & HAM3 in chamber work
TCS HeNe alignment check in BSC1&3
Crane CRS+ table to HAM3
CRS cable runs.
BBSS model up ?