TITLE: 06/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
More Fist contacting the Beam Splitter was done along with Top Gunning it as well.
The SEI HEPI Team of 5 has been trying to Align HEPI.
HAM2 SUS TF were taken.
Viewports inspected by the VAC team.
Jim Is currently taking TFs before floating the ISI in HAM2.
Dave swapped out a timing card WP 13324.
Fast shutter is now working again, Confirmed by Sheila and Camilla.
GRB_Short E640741 @ 21:33:37 UTC
GRB_Short E640743 @ 21:43:41 UTC
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:52 | SAF | LVEA is Laser SAFE | LVEA | NO | LVEA is Laser SAFE | 16:52 |
| 14:48 | FAC | Kim | LVEA | N | Technical cleaning and Resupply | 16:34 |
| 14:58 | BSC2 | Betsy | LVEA | N | Collecting parts, and taking in chamber BSC2 Pics. | 16:07 |
| 15:01 | SUS | Rahul | Remote. | N | taking MC1 - MC3 \\ transfer functions | 16:35 |
| 15:04 | FAC | Randy | LVEA HAM3 | N | MOvign the Nitrogen bottle to HAM3 so folks can top gun | 15:40 |
| 15:33 | EE | Fil | LVEA | N | Placing Bypass on HAM6 High voltage WP #13322 | 15:49 |
| 15:52 | VAC | Gerardo | LVEA | N | Checking HAM2 area and west bay | 16:13 |
| 16:08 | SEI | Jim, Ryan C, Jason | LVEA | N | Working on HEPI Alignment | 17:01 |
| 16:13 | SUS | Ibrahim & Betsy | LVEA | N | Playing with BS smudge looking thing | 17:00 |
| 16:14 | PEM | Anamaria | LVEA | N | Joing the BSC2 smudging crew | 17:00 |
| 16:17 | SQZ | Camilla | LVE SQZ bay | y | Helping Kim put up the Laser Bifurcation fence. | 16:22 |
| 16:26 | FAC | Mitchel | LVEA | N | Getting parts and inventory and staging for helping Jim | 16:50 |
| 16:31 | SEI | Randy | LVEA | N | Helping Jim with HEPI actuation | 16:52 |
| 16:33 | VAC | Travis | LVEA | n | getting part numbers off of pump carts. | 16:40 |
| 16:38 | CRS | Oli, Alex, S. Apple | Optics lab, H2 PSL | local | Looking for top gun and cleaning optics in Laser haz | 19:17 |
| 16:46 | FAC | Kim and Dawn | LVEA | N | Technical cleaning and resupply | 17:36 |
| 17:42 | SQZ | Camilla & Sheila | LVEA HAM6 | Local | Tetsing the fast shuter. | 18:07 |
| 19:00 | PEM | Ryan C | LVEA HAM6 | Local | Checking the Dust mon | 19:09 |
| 19:05 | VAC | Camilla | LVEA HAM6 | Local | Turning Purge air down. | 19:17 |
| 19:27 | VAC | Travis | Mid Y | N | Cheking Pipe cutter fitment. | 20:21 |
| 19:38 | BCS2 | AnnaMaria & Betsy & Ibrihim | LVEA | N | Inspecting BSC2 from the inside, maybe top gunnin? Annamaria Out First | 21:20 |
| 20:04 | VAC | Keita, Jordan, Gerardo | LVEA HAM2 | N | Veiwport checks, jordan out first | 21:15 |
| 20:18 | IAS | Ryan C & Jason | LVEA | N | Prepping Faro Ryan out First | 23:08 |
| 20:21 | SEI | Jim | LVEA | N | HEPI Alignment. | 23:21 |
| 20:40 | CDS | Patrick | MSR | n | Reimaging CS power monitoring Beckoff | 22:26 |
| 20:57 | CRS | Shoshana | LVEA H2 PSL | LOCAL | Dropping off parts tools and Assembly | 22:24 |
| 21:10 | Tour | Landry & Jennie D & Co | Overpass | n | Giving a Tour | 22:40 |
| 21:16 | VAC | Jordan & Gerardo | Mids | N | Looking for parts | 22:26 |
| 21:17 | SEI | Mitchell | LVEA | N | BSC2 HEPI Alignment work with Jim | 22:34 |
| 21:18 | CDS | Dave | HAM SHAQ | N | DAQ restarts and replace the timing card | 22:43 |
| 22:56 | CDS | Dave | HAM Shaq | N | Troubleshooting unresponsive DAQ issues. | 00:56 |