Reports until 11:33, Monday 23 December 2013
H1 IOO
kiwamu.izumi@LIGO.ORG - posted 11:33, Monday 23 December 2013 (9061)
Mid-high power beam dump installed on IOT2L

As a preparation for the PSL power increment, a mid-high power beam dump, Kentek ABD-2NP, was installed in the IMC REFL path on IOT2L. It is in the location of IO_MCR_BD1 (see the layout D0902284-v9). This dump is capable of 50 W.