H1 General
anthony.sanchez@LIGO.ORG - posted 16:40, Friday 12 June 2026 (90611)
Friday Ops Day shift report.

TITLE: 06/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
CRS Team spent some time working in the H2 PSL. 
I beleave some OMC work was done near HAM 6.
The SQZr team did some quick SQZr work before Begum left.
VAC team started heating up the RGA , and has put up some caution tape. 

LOG:

Start Time System Name Location Lazer_Haz Task Time End
22:52 SAF LVEA is  Laser SAFE Bifurcated LVEA NO LVEA is  Laser SAFE Bifurcated near SQZr Bay 01:37
14:57 FAC Kim LVEA N Technical Cleaning & Resupply 16:45
16:10 FAC Randy LVEA N PLugging in Scissor lift and Fork lift. 16:28
16:23 VAC Jordan +2 LVEA N Restart corner bake out for RGA 17:03
16:43 SQZ Sheila & Begum LVEA n SQZT 7 table work 17:00
16:45 FAC Mitchell Both EX & EY N Famis tasks 17:18
18:05 VAC Jordan & Interns LVEA N Ramping up temperature on RGA 18:18
18:16 CRA Shoshana & Disha LVEA H2 PSL N Working on CRS inside the H2 PSL enclosure. 19:03
19:13 VAC Jordan & Interns LVEA n Raising the temperature for the RGA 19:41
19:17 cds Dave HAM Shaq N Labeling cables 19:17
20:46 VAC Jordan & Interns LVEA N Bumping up the temp on the RGA 20:50
21:56 SQZ Keita & Disha LVEA HAM6 Local Working on OMC 23:56
22:08 VAC Jordan & Jake LVEA N RGA temp increase 22:15
23:25 VAC Jordan LVEA N Increasing the RGA temperature 23:30