oli.patane@LIGO.ORG - posted 16:32, Monday 15 June 2026 (90619)
Ops DAY Shift End

TITLE: 06/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

LVEA IS LASER HAZARD

HAM2 ISI has been unlocked and it is in DAMPED


LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
14:00 FAC Kim LVEA n Tech clean 14:56
14:58 FAC Kim EX, EY n Tech clean 16:53
15:00   Christina MX n Inventory 15:15
15:47 SPI Jeff LVEA YES SPI install 18:38
15:47 SPI Betsy LVEA n SPI install / Laser hazard transition 17:38
15:51 FAC Randy LVEA n Breaking down gate valve scaffolding 17:13
16:01 FAC Eric, Chris LVEA n Breaking down gate valve scaffolding 17:12
16:17 VAC Jordan LVEA n Checking on RGA bakeout 16:25
16:21 SEI TJ LVEA n Putting away B&K stuff and turning TCS stuff off 16:41
16:32 SPI Josh LVEA YES SPI install 18:44
16:40 CDS Dave Remote n B2H34 model restart 17:07
16:57 FAC RyanC OpticsLab n Checking out dust monitor 17:14
17:01 SQZ Camilla, RyanS LVEA y(local) SQZT7 work 17:15
17:20 FAC RyanC LVEA y(local) Dust monitor check 17:29
17:40 FAC RyanC LVEA, OpticsLab YES, no More OptLab dustmon checks, in and out of Optics lab 19:35
18:55 VAC Gerardo LVEA YES Turning off purge air 20:05
19:01   Christina LVEA YES Inventory 19:45
19:05 SPI Jeff CER YES Turning on AA chassis in SEI rack 19:09
19:22 EPO Mitchell + 1 LVEA YES Tour 19:45
20:09 EE Marc, Josh LVEA YES Plugging in cables 20:47
20:09 SPI Jeff LVEA YES SPI install 23:00
20:10 CRS Shoshana H2PSL y(local) CRS work 22:21
20:22 SPI Betsy LVEA YES SPI install 23:27
20:47 SPI Josh LVEA YES SPI install 23:00
20:58 SQZ Camilla, Madi, RyanS LVEA YES HAM7 work (Madi out 23:28) 00:55
21:22 SUS Rahul LVEA YES Cleaning up tooling 21:28
21:58 SUS TJ, Oli LVEA YES Checking BS oplev, TJ out at 22:20UTC 22:24
22:24 SUS/EE Oli, FIl CER Y Rack checks 22:39
22:55 SEI TJ LVEA YES Unlocking HAM2 23:27