joshua.freed@LIGO.ORG - posted 17:05, Monday 15 June 2026 (90621)
SPI, ISIK Install Day 3

J. Freed, J. Kissel, TJ. Shaffer, B. Weaver, M, Pirello

Continuing from 90581 (Notes are stored here).Today we completed all of the inside optical fiber install, Got our first light out of SPI, Managed to send it from one ham table and back again.  As well as align the reference interferometer to produce a beat note with decent efficiency (~75%).

We also connected the HAM2 wiring from HAM2 feedthrough to TIA to CDS system.

In order we did:


SPI_QPD_HAM2_Unlock.png  Shows a screenshot of ndscope screens of the QPDs. Note the purple areas. The HAM2 unlock did show an effect on ISIK QPD (QPDB) but QPDA was insensitive to the Unlock. 