Displaying report 1-1 of 1.
Reports until 17:19, Wednesday 10 June 2026
H1 CDS (SPI)
filiberto.clara@LIGO.ORG - posted 17:19, Wednesday 10 June 2026 - last comment - 21:28, Tuesday 16 June 2026(90585)
SPI Fiber Cover Installed

A plexi security cover was installed over the SPI Laser Chassis. Cover will be locked under normal operating conditions.

Images attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 21:28, Tuesday 16 June 2026 (90646)
More pictures of the plexi-glass hatch. It secures to the chassis via screws and stand-offs, and has side openings. The box is merely trying to satisfy the "requires a tool to detach the fibers" criteria to make the system laser safe. The key will live in the control room lock box with all the other laser safety keys.
Images attached to this comment
Displaying report 1-1 of 1.