H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Thursday 18 June 2026 (90672)
OPS Thursday Day shift summary

TITLE: 06/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: BBS checks, SPI, and CRS work continued. (Covering the end of day for TJ).
LOG:                                                                                                                                                         

Start Time System Name Location Lazer_Haz Task Time End
20:18 SAF LVEA IS LASER HAZARD LVEA YES LVEA IS LASER HAZARD 12:18
15:44 SPI Jeff, Josh LVEA Y SPI HAM3/2 work 18:58
15:58 SPI Jennie LVEA Y SPI HAM3/2 work 18:58
16:01 CRS Betsy LVEA Y Checking on chamberside test site for CRS 16:26
16:26 SEI Jim, Randy, Shoshana LVEA Y Crane and move CRS from H2 to next to HAM3 17:10
16:52 VAC Travis LVEA Y Removing the old ISI oplev viewports on input and output arms 19:01
16:58 SUS Ryan C CR,EX,EY n SUS oplev charge measurements 18:58
17:35 SEI Fil, Jason LVEA Y Looking at the ISI oplev setup with Travis 18:21
18:08 SEI Shoshana LVEA Y CRS work near HAM3 20:25
18:37 VAC Gerardo LVEA Y Helping removing viewport by HAM2 20:02
18:59 SPI Josh LVEA Y SPI electronics racks 20:36
19:15 SUS Betsy, Camilla LVEA Y Going into HAM3, BSC2. Camilla out 20:45 21:38
20:14 SUS Sheila LVEA Y Swap in for Camilla 21:38
20:21 SPI Jennie LVEA Y Looking for shroud parts 22:32
20:21 SPI TJ LVEA Y Installing shroud Ongoing
20:25 SPI Jeff LVEA Y SPI work 22:32
20:39 SUS Oli LVEA Y HAM3/BSC2 checks 21:38
20:52 SUS Tom LVEA Y Join BBS team 21:59
20:57 SUS Camilla LVEA Y Grab stuff 20:58
21:30 FAC Randy, Ibrahim LVEA Y Move a scissor lift, find ameristat wrapper 21:43
21:38 EPO Elenna, Deon, Matilda, Shrey, Khanh LVEA Y Tour the LVEA 22:34
21:42 VAC Travis LVEA Y Viewport swap continued 23:20
21:51 VAC Gerardo LVEA Y CP1, check out pipes 21:58
22:01 SPI Josh LVEA Y SPI work at SUS R2 rack Ongoing
22:25 SPI Betsy LVEA Y Check on SPI crew 22:35
22:37 SUS Ibrahim, Tom, Deon, Oli LVEA Y BSC2 cross coupling investigation and tour 23:34
22:43 SEI Jim LVEA/CR Y Diagnose HAM5 rack sensor signals 23:25