TITLE: 06/24 Day Shift: 2200-2330 UTC (1500-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
SHIFT SUMMARY: Two large earthquakes have rolled through in the last hour, a 7.1 from Venezula and a 6.9 from Japan. EY SEI has tripped, but all suspensions are still damping.
The LVEA is laser SAFE as we continue toward closing out chambers.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 20:18 | SAF | LVEA is LASER -SAFE- | LVEA | NO | LVEA is LASER -SAFE- | 12:18 |
| 22:55 | SPI | SPI LASER IS ON | LVEA | Y | SPI LASER is ON | 18:42 |
| 00:18 | CRS | CRS laser is ON | LVEA | Y | CRS laser is ON | 18:42 |
| 14:45 | fac | kim | lvea | - | technical cleaning | 16:45 |
| 15:06 | fac | chris.tyler.eric.randy | Y1-FCT Enclosures | - | tumbleweed clearing | 16:51 |
| 17:51 | sei | jim | HAM3 | - | CPS work | 19:47 |
| 17:53 | vac | gerardo | HAM3 | - | viewport work | 19:05 |
| 17:53 | pem | robert | EX | grounding studies | 17:55 | |
| 17:54 | fac | randy | lvea | - | WestBaycleanroom lights | 21:53 |
| 18:02 | faro | jason.ryanC | ham3 | - | FARO set up | 19:19 |
| 18:06 | - | Betsy | LVEA | - | Talk to HAM3 crew | 18:47 |
| 18:25 | crs | michaelR | lvea | - | Turning OFF CRS laser + CRS checks | 18:43 |
| 19:07 | vac | gerardo.jordan | Y-BeamManifold | - | scaffold search | 19:19 |
| 19:42 | CE/pem | carlos.shrey | x-arm | n | seismometers placement along arm | 23:15 |
| 20:12 | ops | betsy | lvea | n | walkthru | 20:32 |
| 20:26 | detchar | jenne group | lvea | - | DetChar tour | 21:19 |
| 20:29 | faro | ryanC.jason | lvea | - | faro @ham3 | 22:47 |
| 20:43 | SEI | Jim, Michael, Shoshana.mitch | LVEA | - | BSC2 weighting (all but Jim out @2222) | 23:04 |
| 20:55 | spi | oli.jeff.arnaud | lvea | - | susr2 check (please no BBSS work!) | 23:30 |
| 21:01 | vac | jordan.gerardo | lvea | - | viewport inspection @ham2 | 21:30 |
| 21:20 | ee | fil | lvea | - | checking cables at PSL Closet+tcsy rack | 21:28 |
| 22:45 | VAC | Jordan, Jake, Owen | LVEA | n | Checking on CP1 RGA | ongoing |
| 23:17 | PEM | Robert and others? | EX | n | Magnetometers | ongoing? |
| 23:30 | SEI | Arnaud | LVEA | n | CRS work | ongoing |