TITLE: 06/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
BBSS' pitch appears to be fine & at end of shift one of its OSEMS. Actuators beginning to get installed on BSC2 ISI. HAM3 also was a hub of activity with CRS prep, baffling installed, v& iewport swap. We also have a new Reservation System with graphical status of laser hazard/safe (thanks TJ!).
LOG:
- 1443-1526 swapping lights for West Bay cleanroom (randy)
- 1445-1546 technical cleaning in lvea (kim)
- 1630-1818 technical cleaning at ey (kim)
- 1511-1521 Walkabout in lvea/talk to randy (richard)
- 1541-1546 HAM2 Annulus Ion Pump check (jordan)
- 1550-1854 HAM3 baffling (mitch)
- 1552 bsc2 work (jim)
- 1557-1715 HEPI work (randy)
- 1559-1649 photos in bsc2 (ibrahim)
- 1602-1611 touching base w/ ibrahim (betsy)
- 1605-1614 parts search @lvea (tj)
- 1613-1800 testing seismometers on xarm (carlos.shrey)
- 1617-1651 grabbing parts in optics lab (madi)
- 1634-1645 tcs chiller (corey)
- 1635-1739 CRS set-up @ham3 (michael.shoshonna)
- 1638-1743 FARO set-up (jason.ryanC)
- 1717-1727 checking on install teams in lvea (betsy)
- 1735 HAM2 viewport checks (gerardo.jordan)
- 1845 HAM1 cleanroom turned off
- 1845 jordan out
- 1738-2013 ham3 cps (jim,jeff)
- Verbal: "ham3 cps glitch" received
- 1816 arnaud joining
- 2000 jeff out
- 2003 mitch checking on cps team
- 1815-1849 Grabbing part inside ISCTEY, which requires brief laser hazard (camilla.madi)
- 1832-1835 EY laser HAZARD briefly
- 1830 RyanS noticed that the JAC was not DOWN (it was attempting TRANS DC LOCKED for some reason), so it was taken to DOWN.
- 1850-1903 grabbing nanoscan for EX Hartman work in afternoon (camilla)
- 1917-2034 Pitching BBSS upper mass in bsc2 (ibrahim)
- 1920-2034 Working computer for BBSS pitch relief outside ham3 (ryanS.betsy)
- 1924-1955 Running fire pumps (eric)
- 1949-2007 CER check (richard)
- 2012-2026 transitioning lvea to quick laser HAZARD (ryanS)
- 2026-2050 BBSS alignment checks with PSL beam (keita)
- 2029 Removing viewport @ham3 (gerardo)
- 2036 EX Hartman work, will be laser hazard for a few hours today and transitioned back to safe today (camilla.madi.tj)
- 2111-2122 transitioning lvea to quick laser SAFE (ryanS)
- 2126 BSC2 HEPI Actuator install (jim.mitch)
- 2147 Adjusting BBSS OSEM (ibrahim.oli)
- 2151-2259 LVEA walkthrough/check on install teams (betsy)
- Betsy went out again and came back at 2322
- 2154-2217 LVEA walkthrough (richard)
- 2253 EX grounding studies (robert & detchar visitors)
- 2257 HAM5 ISI tripped (ryanS), no activities should be near there, untripped & brought back.