Ibrahim, Oli
Today we re-centered M2 BOSEMs and M3 AOSEMs following BBSS alignment work.
These were centered with OpticAlign Offsets of P = 107, Y = 441. These are thought to be a "good" alignment.
We also replaced AOSEM 771, which had bad counts (14k OLG) with AOSEM 770 (high counts at 25.5k - at open light 22.2k - the OLG would change in-chamber depending on whether it's backed out or in my hand).
Then, we also re-attached the LL AOSEM - see picture of cabling - we will likely redo all cabling.