Reports until 22:30, Thursday 25 June 2026
LHO VE (VE)
gerardo.moreno@LIGO.ORG - posted 22:30, Thursday 25 June 2026 (90768)
CP1 Cooldown Update

(Jordan, Owen, Jake, Gerardo)

The cryotrap cooldown continues, we continue to pump on the cryotrap volume with a turbo pump, the turbo is backed with a SS500 aux cart.

Small changes were the removal of the calibrated leak from the RGA tree, along with the removal of other components in preparation to install an incoming small ion pump next week.

Current pressure in the cryotrap volume is 7.38X10-10 Torr.

 

Images attached to this report