TITLE: 06/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Main activities today were: SQZ measurements in lvea + control room, connecting actuators for BSC2 hepi, ham3 baffling...
LOG:
- 1508-2130 Beginning Y-arm asphalt sealing for Y1. Made it about 0.5km today. (randy.tyler)
- 1553 Re-run of SQZ sweep measurement (~40min) with SQZ injected beam (sheila.eric.ryanS)
- 1557 reboot of nuc20 for new cds overview (dave)
- 1607-1629 reboot of nuc30 due to disk space (erik)
- 1620 Let Big D construction thru gate (MY+ camera is pretty dirty and hard to view)
- 1625-1650 troubleshoot pressure gauge HAM4 (jordan.jacob)
- 1645-1714 grounding studies @EX (robert)
- 1730-2032 HEPI actuator @bsc2 (jim.mitch)
- 1719-1728 troubleshoot (round2) pressure gauge HAM4 (jordan.jacob)
- 1759-1933 tour of the roof observation deck + lvea (robert+interns)
- 1815-1829 staging parts at HAM2 + checking pressure gauge at HAM4 (jordan)
- 1823-1935 beam profile measurements @isct7 (sheila.eric.ryanS)
- 2013-2029 quick trip to SUSR2 rack (jeff)
- 2015 troubleshoot (round3) pressure gauge HAM4 (jordan.jacob)
- 2028-2144 more beam profile measurements @sqzt7 (ryanS.eric)
- 2053-1610 removing viewports (qty2) from HAM2 (jordan.jacob.owen)
- 2111 setting up for baffling work at HAM3 (robert.disha)
- 2120-2242 Finishing touches on bsc2 hepi actuators (jim.mitch)
- 2130-2257 SPI Optics lab clean-up (jeff)
- 2228-2255 Quick lvea tour (elenna+detchar group)
- 2240 VerbalAlarm changed to remove the HAM3 CPS glitch alarm we had been getting every few minutes for the last 30+hrs
- 2245-2322 HEPI pump troubleshooting (jim)