Reports until 07:41, Monday 29 June 2026
LHO General
corey.gray@LIGO.ORG - posted 07:41, Monday 29 June 2026 (90788)
Mon Day Ops Transition

TITLE: 06/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 15mph Gusts, 12mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s 
QUICK SUMMARY:

Mon/Early week activities:  GV6(Y-BM) work this morning, BBSS activities with FARO continued, BSC3 rebalance for baffles, HAM3 CPS upgrades, Install CRS, HAM3 baffling, HAM3 ground loop checks.

Rain system just passed through the site on this cloudy morning.  M5.5 earthquake off the southern coast Oregon coast (no WD trips).  Kim is already in the lvea and also covering other buildings more than usual.