TITLE: 06/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 13mph Gusts, 7mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.12 μm/s
QUICK SUMMARY:
Ops workstation (cdsws29) was stuck recovering from morning reboot (hit the on/off button to restore). nuc23 & nuc22 look like they partially came back (will need to log back into them to sort their app windows.
BSC2 SEI work continues (w/ L4C swap & other final checks), FARO measurements may be complete (but FARO remains set-up outside HAM3 just in case). SQZ work continues as well as HAM3 activities and also transfer functions for ITMy.
FOM notes: