This morning Randy and I moved the IOT2L ISC table back into place on the +Y side of HAM2. Fil can now cable it back up, although the cleanroom leg is very near all of the cable plug ins on the +X side so we may need to make a cleanroom shift.
Then it will need bellows reattached and eventually beam checks to realign.