TITLE: 07/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
CDS restarts started ~16:15:55 UTC
BS CPS glitch at 18:19:20 UTC <---- lots of these throughout the day.
Dome has been flown back on!
Beam splitter QOsums are shorting, and unfortunately there is now a shortage.
Ground Loops were checked.
PEM Stray light checks in HAM3.
CRS still on going.
CPS still on going.
Patrick went to EY to work on HEPI beckhoff, before he went he had me take the H1:HPI-PUMP_EX_CTRL_RMT_OUTPUT Voltage down Slowly while watching H1:HPI-PUMP_EX_CTRL_RMT_INPUT.
The following channels have been having technical difficulties while Fil and Patrick were at EY working on HEPI Beckhoff:
H0:VAC-EY_Y3_PT410B_PRESS_TORR
H0:VAC-EY_Y2_PT424B_PRESS_TORR
H0:VAC-EY_Y1_PT423B_PRESS_TORR
H0:VAC-EY_INSTAIR_PT499_PRESS_PSIG
Jordan is aware and watching it. Says it's a "waiting game now".