TITLE: 07/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 17mph Gusts, 9mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.06 μm/s
QUICK SUMMARY:
Work Trello is suggesting today:
HAM3/BSC2 - In chamber work, after FARO/HEPI work - Suspend, TFs (Ibrahim, Betsy, Oli)
Finish CPS upgrade in HAM3
Install CRS in HAM3
BBSS - Diagonalize Pit to Yaw coupling.... again?
HAM7 - In-chamber SQZ work continued, in local laser Haz
VAC View port inspections
Notes: BS CPS glitch has been happening all night.