hugh.radkins@LIGO.ORG - posted 15:40, Friday 10 June 2011 (909)
HEPI Phase2 Welding In Progress
The HEPI Plumbing is now in the LVEA.
Image1 is the turns up on the Mezzinine. #2 is below the mezzinine heading into the LVEA. #3 is in the LVEA at the piping bridge.