TITLE: 07/06 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
HEPI alarms are not currently set correctly. The good-ole Verbal Alrams system uses the channel names to flag alarms to the control room. These channel names have been changed in the last 2 weeks. H1:HPI-PUMP_EX_DIFF_PRESS_PSI is te new name for EX.
CRS and ISI work continues
EE folks have been starting some SPI Shutter cabling.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:49 | FAC | Kim | LVEA | YES | Tech clean (in 14:40) | 15:41 |
| 15:19 | SEI/SUS | TJ | LVEA | YES | B&K-ing HAM3 | 18:12 |
| 15:25 | SEI/SUS | Betsy | LVEA | YES | B&K-ing | 16:13 |
| 15:57 | Mitchell | LVEA | YES | Prepping stuff | 16:17 | |
| 16:05 | FAC | Kim | LVEA | YES | Tech clean | 16:35 |
| 16:06 | SQZ | Camilla | LVEA | YES | Turning SQZ laser back on | 16:18 |
| 16:13 | SEI/SUS | Rahul | LVEA | YES | B&K-ing HAM3 | 18:10 |
| 16:35 | FAC | Kim | MX, EX | n | Tech clean | 17:50 |
| 16:39 | CRS | Shoshana | LVEA | YES | Turning on CRS laser and tracking down fiber issue | 16:57 |
| 16:49 | SEI | Jim | LVEA | YES | Centering ITMX ISI | 17:43 |
| 17:23 | EE | Fil | LVEA | n | Cabling temp cable over to HAM3 | 19:22 |
| 17:30 | VAC | Gerardo, Richard | LVEA | YES | Gerardo: \ | 17:48 |
| 17:33 | CDS | Patrick | EX | n | Completing HEPI Beckoff work | 20:06 |
| 17:34 | TCS | Camilla | PCAL Lab | n | Reassembling viewports | 18:31 |
| 17:40 | Betsy | LVEA | YES | Walkaround | 17:58 | |
| 17:49 | SAF | Tony, Shoshana | LVEA | Y->N | Transitioning LVEA to Laser SAFE | 18:31 |
| 18:32 | SEI | Jim | LVEA | n | HAM3 work | 18:33 |
| 18:59 | Camilla, Mitchell | LVEA | n | Grabbing parts in West Bay | 19:25 | |
| 19:17 | EE | Jackie | LVEA | n | Helping Fil with cabling | 19:22 |
| 19:29 | FAC | Randy | LVEA | n | Taking a walk around the LVEA | 19:57 |
| 19:49 | SEI | Jim, Shoshana | LVEA | n | HAM3 CRS and ISI work | 00:08 |
| 20:08 | SUS | Ibrahim | LVEA | n | BBSS gunning and OSEM centering | 22:58 |
| 20:09 | SUS | Rahul | LVEA | n | Helping gun the BBSS | 21:01 |
| 20:09 | SEI | Mitchell | LVEA | n | Maybe helping with HAM3 work | 20:25 |
| 20:10 | SUS | Oli | LVEA | n | BBSS OSEM centering | 22:58 |
| 20:10 | PEM | Carlos +1 | EY | N | Magnatometer testing at EY | 22:12 |
| 20:25 | Cheta | Camilla & Betsy | LVEA | N | Checking Cheta viewports. | 21:00 |
| 20:59 | Safety | Richard | LVEA | N | Searching for Travis | 21:13 |
| 21:01 | VAC | Travis | LVEA | n | Beirgarden putting relay tube back on? | 22:54 |
| 21:21 | Cheta | Camilla & Gerardo | Lab then LVEA | n | Working on Cheta View ports | 00:21 |
| 21:43 | Safety | Richard | LVEA | N | looking at outlet | 21:54 |
| 22:17 | IFO | Betsy | LVEA | N | Walk about putting things away | 23:00 |
| 23:03 | EE/SPI | Fil | LVEA HAM1 | N | Getting cable measurments for SPI shutter. | 23:16 |