H1 CDS (CDS, SEI)
patrick.thomas@LIGO.ORG - posted 16:58, Monday 06 July 2026 (90914)
end X Beckhoff HEPI pump control running again
WP 13304.

"Reimage the Beckhoff machine controlling the HEPI pump controller at end X and the Beckhoff machine controlling the HEPI controller at end Y. Change the code and infrastructure to match what was done at the corner station."

I completed end X today. This completes the WP, except for a DAQ restart, which is planned for tomorrow. I will close the WP after that has been done.

All HEPI pump stations are up and running on PID control.