TITLE: 07/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: BSC1 DOORS ARE ON. Also CRS is installed!! LVEA IS LASER HAZARD
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:34 | FAC | Kim | LVEA | YES | Tech clean | 15:18 |
| 15:30 | TCS | Camilla | Prep Lab | n | First contacting viewports | 18:19 |
| 15:33 | FAC | Kim | LVEA | YES | Tech clean | 16:47 |
| 15:35 | FAC | Randy | LVEA | YES | Craning WB -> HB | 15:55 |
| 15:52 | FAC | Chris + PestControl | LVEA, Mids, Ends | YES, n | Checking traps | 16:58 |
| 16:05 | VAC | Jordan | LVEA | YES | CP1 Ion Pump work | 16:16 |
| 16:22 | PCAL | Tony | PCAL Lab | y(local) | Packing up sphere | 17:30 |
| 16:39 | PEM | Carlos, Shrey | LVEA | YES | Setting up seismometers | 17:59 |
| 16:48 | FAC | Kim | MY, EY | n | Tech clean | 18:27 |
| 16:50 | EE | Jackie, Fil | MY | n | Dropping off cables | 17:06 |
| 16:50 | VAC | Jordan | LVEA | YES | CP1 Ion pump work continued | 17:10 |
| 16:57 | VAC | Travis | MX, MY | n | Taking pics of pumps | 17:18 |
| 16:58 | CRS | Jim, Shoshana, Mitchell | LVEA | YES | CRS work (Jim, Mitchell out 19:00) | 19:44 |
| 16:59 | FAC | Chris | Mids, Ends | n | Safety tasks | 18:54 |
| 17:03 | FAC | Randy | LVEA | YES | Craning in WB | 19:04 |
| 17:23 | Betsy | LVEA | YES | BSC internal sweep + wafers | 18:34 | |
| 17:30 | Cory | LVEA | YES | Walkthrough with Betsy | 17:50 | |
| 18:02 | VAC | Gerardo | LVEA | YES | Moving equipment from CP1 to CP2 | 20:20 |
| 18:29 | TCS | Camilla, Matt | LVEA | YES | Tidying up from yesterday's viewport installation (Matt out 19:19) | 20:20 |
| 18:40 | VAC | Jordan | LVEA | YES | Installing viewport | 19:11 |
| 19:04 | FAC | Randy | LVEA | YES | Prepping for BSC2 door | 19:40 |
| 19:57 | FAC | Travis, Randy, Jordan | LVEA | YES | BSC1 door (Travis out 21:44) | 22:32 |
| 20:09 | SEI | Jim, Shoshana | LVEA | YES | HAM3 CRS and ISI work | 22:53 |
| 20:23 | ISC | Tony | LVEA | YES | ISCT2 bellows | 23:12 |
| 20:27 | CDS | Patrick | EX | n | Reimaging NCAL computer | 22:07 |
| 21:30 | Betsy | LVEA | YES | Checking on everything | 21:53 | |
| 21:56 | SUS | Rahul | LVEA | YES | Putting tools out by HAM7 | 22:32 |
| 22:02 | SQZ | Sheila | LVEA | YES | Looking inside HAM7 | 22:27 |
| 22:07 | EE | Fil, RyanS | LVEA | YES | Testing out SPI shutter | 22:25 |
| 22:09 | TCS | Camilla | LVEA | YES | Checking on Tony, then CHETA viewport work | 23:18 |
| 22:36 | VAC | Gerardo | LVEA | YES | CHETA Viewport work | ongoing |
| 22:56 | SEI | TJ | LVEA | YES | Retrieving B'N'Kase | 23:07 |
| 23:01 | SEI | Jim | LVEA | YES | Troubleshooting HAM3 | 23:08 |
| 23:03 | VAC | Jordan | LVEA | YES | CHETA Viewport work | ongoing |
| 23:08 | SEI | Jim | CER | YES | Troubleshooting HAM3 from a different place | 23:09 |
| 23:21 | SEI | Jim | LVEA | YES | Troubleshooting HAM3 from HAM3 | ongoing |