TITLE: 07/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 10mph Gusts, 5mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.08 μm/s
QUICK SUMMARY: Some wind and one LVEA dust alarm overnight, otherwise nothing else to report. The LVEA is still Laser HAZARD for HAM3 CRS work to bring us closer to being able to close up that chamber either today or tomorrow. SQZ work continues at HAM7 with strain gauge adjustment on ZM4 and prep for swapping ZM5.