TITLE: 07/08 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Work on the CRS and the ISI in HAM3 finished up this morning, so the LVEA went Laser SAFE and doors were put back on HAM3. The corner vacuum volume is now fully closed, and pumping has started on the annulus. Additionally, scaffolding is now in place on GV7 and caution tape is up; exercise caution around the Y termination slab.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:47 | FAC | Kim | LVEA | - | Technical cleaning | 15:55 |
| 14:55 | FAC | Randy | LVEA | - | Craning skid box from hi-bay | 15:24 |
| 16:03 | FAC | Tyler, Randy | LVEA | - | Craning scissor lift to W-bay | 17:16 |
| 16:05 | VAC | Gerardo | LVEA | - | Starting BSC1 annulus pumping | 17:01 |
| 16:08 | VAC | Jordan | LVEA | - | Starting BSC1 annulus pumping | 17:01 |
| 16:15 | SQZ | Camilla, Madi | LVEA | Local | Checking beam height on ZM2 | 17:46 |
| 16:18 | SAF | Tony, Shoshana | LVEA | - | Transitioning to Laser SAFE | 16:38 |
| 16:19 | TCS | Matt | Prep Lab | - | Unpacking lens | 16:26 |
| 16:21 | SEI | Jim, Mitch | LVEA | - | HAM3 HEPI actuators (Mitch out @ 17:49) | 18:01 |
| 16:36 | SUS | Rahul | LVEA | - | Looking for torque wrench parts | 16:54 |
| 16:38 | SEI | Shoshana | LVEA | - | HAM3 HEPI actuators | 18:18 |
| 16:39 | SAF | Fil, Jackie | LVEA | - | Measurements for interlock on HAM1/2 | 19:23 |
| 16:52 | FAC | Kim | FCES | - | Technical cleaning | 18:00 |
| 16:54 | SQZ | Rahul | LVEA | Local | ZM4 strain gauge adjustment | 18:50 |
| 17:00 | AOS | Betsy | LVEA | - | Check in with HAM3 | 17:22 |
| 17:13 | SAF | Richard | LVEA | - | Safety checks | 17:33 |
| 17:15 | SQZ | Sheila | LVEA | - | HAM7 work | 18:50 |
| 17:37 | FAC | Randy, Eric, Chris | LVEA | - | Building scaffolding | 19:02 |
| 18:22 | Richard | LVEA | - | Checking in on scaffolding guys | 18:33 | |
| 18:38 | VAC | Travis | LVEA | - | Looking for viewport blanks | 19:04 |
| 18:50 | TCS | Madi | OptLab | - | Looking for lens boxes | 18:58 |
| 19:41 | FAC | Randy, Eric, Chris | LVEA | - | Building scaffolding | 21:08 |
| 20:36 | FAC | Tyler | LVEA | - | Check on scaffolding progress | 20:50 |
| 20:45 | VAC | Jordan | LVEA | - | HAM3 doors | 23:54 |
| 20:47 | SQZ | Sheila, Nergis | LVEA | Local | HAM7 beam alignment | 23:07 |
| 20:50 | TCS | Camilla, Matt | PrepLab | Local | CHETA work | 22:21 |
| 20:51 | VAC | Gerardo | LVEA | - | HAM3 doors | 00:50 |
| 20:51 | VAC | Tyler | LVEA | - | HAM3 doors | 23:24 |
| 20:53 | VAC | Travis | LVEA | - | HAM3 doors | 23:46 |
| 20:56 | AOS | Betsy | LVEA | - | Assisting w/ HAM3 doors | 21:38 |
| 21:01 | SAF | Fil, Jackie | LVEA | - | Drilling unistrut on HAM1 | 22:06 |
| 21:08 | FAC | Randy | LVEA | - | HAM3 doors | 23:23 |
| 21:26 | SAF | Richard | LVEA | - | Checking on door crew | 23:23 |
| 22:00 | AOS | Betsy, Corey | LVEA | - | Setting up for viewing HAM3 doors (Betsy out @ 22:36) | 23:23 |
| 22:45 | TCS | Camilla, Madi | EX | Y | Removing temp laser from table | 23:45 |
| 23:24 | SAF | Fil | LVEA | - | Drilling unistrut near CO2X table | 00:24 |