TITLE: 07/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Preparations continued today for corner volume pumpdown.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:39 | FAC | Randy | LVEA | - | Craning pump carts to W-bay | 14:51 |
| 15:13 | FAC | Kim | LVEA | - | Technical cleaning | 16:28 |
| 15:29 | SQZ | Sheila | LVEA | Local | SQZ beam measurements | 17:05 |
| 16:07 | FAC | Randy | LVEA | - | Craning boxes | 17:58 |
| 16:12 | VAC | Gerardo | LVEA | - | Checking on HAM3 annulus | 16:17 |
| 16:26 | PEM | Carlos, Shrey | LVEA | - | Checking on seismometers | 18:26 |
| 16:28 | SUS | Rahul | LVEA | - | Prep for ZM5 swap | 17:58 |
| 16:33 | SAF | Betsy | LVEA | Y | HAZARD/SAFE transitions | 17:10 |
| 16:34 | TCS | Matt | OptLab | - | Looking for stage driver | 16:59 |
| 16:43 | TCS | Camilla | PrepLab | Local | CHETA work | 16:48 |
| 16:43 | SEI | Shoshana | LVEA | Y | CRS health check | 16:56 |
| 16:48 | ISC | Camilla | LVEA | - | Camera can reattachment | 16:57 |
| 16:51 | TCS | Madi | OptLab | - | Checking lenses | 18:46 |
| 16:57 | TCS | Camilla | PrepLab | Local | CHETA work | 17:40 |
| 16:59 | TCS | Matt | PrepLab | Local | CHETA work | 17:37 |
| 16:59 | SAF | Fil | LVEA | - | Safety cabling on HAM1/2 | 22:31 |
| 17:05 | VAC | Gerardo | LVEA | - | Prepping pumps | 21:07 |
| 17:17 | VAC | Jordan, Travis | LVEA | - | Viewport covers at HAM7, HAM3 (Travis out @ 19:23) | 20:09 |
| 17:37 | FAC | Eric | FCES | - | Checking AHU | 17:47 |
| 17:37 | AOS | Mitchell | LVEA | - | 18:10 | |
| 17:40 | TCS | Camilla | OptLab | - | Checking lenses | 17:46 |
| 17:59 | SUS | Ryan C | LVEA | - | Dropping off parts at HAM7 | 18:03 |
| 18:03 | SEI | Jim, Shoshana | LVEA | - | Packing up CRS parts | 19:12 |
| 18:07 | SAF | Richard | LVEA | - | Checking in w/ VAC | 19:31 |
| 18:11 | SUS | Rahul | LVEA | - | Unplugging ZM5 breakout board | 18:17 |
| 18:47 | TCS | Camilla, Matt | PrepLab | Local | CHETA work | 19:13 |
| 19:17 | SEI | Shoshana | LVEA | - | Putting away parts | 19:24 |
| 19:29 | FAC | Randy | LVEA | - | Craning skid box | 20:29 |
| 19:49 | SUS | Rahul | LVEA | - | Resistance measurement at HAM7 racks | 20:41 |
| 19:53 | PEM | Carlos | LVEA | - | Checking seismometers | 21:53 |
| 21:07 | VAC | Jordan, Travis | LVEA | - | Pumpdown prep | Ongoing |
| 21:10 | TCS | Madi | OptLab | - | HWS lens measurements | Ongoing |
| 22:15 | SAF | Richard | LVEA | - | Checking on VAC | 22:31 |
| 22:20 | TCS | Camilla, Matt | PrepLab | Local | CHETA work | 23:07 |
| 22:31 | SEI | Jim | CER | - | Checking electronics | 22:44 |
| 22:44 | SUS | Rahul | LVEA | - | Turning on ZM4/5 chassis | 22:52 |
| 22:58 | SEI | Jim | LVEA | - | Troubleshooting L4C | 23:17 |
| 23:07 | TCS | Camilla | OptLab | - | HWS lens measurements | Ongoing |
| 23:11 | PEM | Carlos, Shrey | LVEA | - | Seismometer checks | 23:20 |