Reports until 16:30, Friday 10 July 2026
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:30, Friday 10 July 2026 (90988)
OPS Day Shift Summary

TITLE: 07/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for MAINTENANCE

Pumpdown continues - see attached screenshot

Ryan S, Sheila and Daniel also did some work at SQZT7

In other news,

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:57 VAC Jordan LVEA N Continuing Pumpdown 23:56
15:12 SEI Shrey LVEA N Seismometer Tests 18:06
15:19 FAC Dawn, Kim LVEA N Technical Cleaning 16:00
16:01 FAc Kim LVEA N Technical Cleaning 16:59
17:26 SQZ Daniel, Sheila, Ryan S LVEA N SQZT7 18:19
18:19 SUS Mitchell LVEA N \ 18:29
20:19 SQZ Ryan S LVEA Local Transitioning to local laser hazard, then SQZT7 periscope mirror moving 22:37
20:33 SQZ Daniel LVEA Local SQZT7 20:39
20:39 SQZ Sheila LVEA Local SQZT7 Periscope mirror moving 22:37
20:46 FAC Randy LVEA Local Checking on fitted plates 21:00
23:09 PCAL tony PCAL Lab Local Sorting 00:09

 

Images attached to this report