Displaying report 1-1 of 1.
Reports until 16:52, Friday 10 June 2011
H2 INS
greg.grabeel@LIGO.ORG - posted 16:52, Friday 10 June 2011 (910)
HAM 7 HEPI Install

The North end of HAM 7 has had the weldments and crossbeam attached. It was a very tight fit to move the crossbeam between the two chambers. Some creativity was called for, but installing the crossbeam for HAM 8 may require even more. The next steps will be to finish the clamp on the crossbeam and torque the bolts all of the bolts.

Images attached to this report
Displaying report 1-1 of 1.