OPS Day Shift Summary

TITLE: 07/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for MAINTENANCE

Productive day in which:

Oli is taking over the remainder of this shift and will add comments if relevant.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:57 VAC Jordan LVEA N Continuing Pumpdown 14:52
14:52 FAC Kim LVEA N Technical Cleaning 15:55
15:52 TCS Matt CHETA Lab Local Aligning 16:27
16:14 FAC Kim LVEA N Technical Cleaning 17:04
16:25 TCS Camilla CHETA Lab Local Aligning 16:27
16:29 SEI Shrey, Carlos, Miranda LVEA N Seismometer Checks 17:54
16:36 SUS Rahul LVEA N ZM5 Work HAM7 18:29
16:39 SUS Ryan C LVEA N ZM5 Work HAM7 18:24
16:57 EE Fil LVEA N HAM4 TCS Rack 18:29
17:12 OPS Ryan S LVEA N Laser Transition to Operations Safe 17:58
17:16 VAC Travis Ey N Parts 17:58
17:37 SUS Mitchell EX/EY N FAMIS Task 18:19
17:40 FAC Kim LVEA n Grabbing garb 17:52
17:53 FAC Kim EX n Tech clean 18:21
17:53 EE Marc LVEA N Whitening chassis change 18:45
18:01 VAC Travis LVEA n Troubleshooting pumps 18:29
18:06 TCS Matt Prep Lab y(local) CHETA work 19:23
18:07 SPI Jennie LVEA n Unshuttering SPI laser 18:10
18:16   Madi OpticsLab n Grabbing laptop 18:22
18:23 VAC Gerardo LVEA n Troubleshooting pump 18:29
18:24   RyanC LVEA n Grabbing phone 18:27
19:10 FAC Camilla, Tyler LVEA N Scaffolding tagging + camera cans -tyler out 19:16utc 19:21
19:50 EE Fil MSR N Cabling 21:47
20:15 VAC Gerardo LVEA N HAM1 Pump 22:15
20:16 SUS Ryan C LVEA N ZM5 Work HAM7 22:16
20:20 VAC Travis LVEA N HAM1 Pump 22:10
20:21 FAC Christina Optics, LVEA, MSR N Label Photos 21:32
20:30 PEM Shrey, Carlos, Miranda LVEA n Seismometers 22:30
20:36 SUS Rahul LVEA N ZM5 Work 22:36
20:58 FAC Richard LVEA N Checking on DM10 21:10
21:14 EE Marc LVEA n Reinstalling BBSS M1 satamp 21:31
21:47 SUS Betsy LVEA N HAM1 Pump 22:47
Images attached to this report
Comments related to this report
oli.patane@LIGO.ORG - 17:14, Monday 13 July 2026 (91012)

Power glitch at 22:31 UTC, tripping the HEPI pump controller and both ISI stages of ETMX and ETMY. Tony, RyanS, and TJ went down to the end stations and turned the pump controllers back on. Then I was able to bring HEPI and the ISIs back up.

Extra reservation system entries:

Start Time System Name Location Lazer_Haz Task Time End
22:44 SEI RyanS, Tony EX n Restarting HEPI controllers 23:48
22:49 SEI TJ EY n Restarting HEPI controllers 23:48
23:16 PEM Carlos, Miranda, Shrey LVEA n Seismometer work (Miranda back 23:37) 00:00