We had a power glitch at 06:01, most probably due to an electrical storm.
Richard and Gerardo are on-site recovering FAC and VAC.
CDS status: both main DAQ legs are down. All front ends are down. NDS3 (vacuum trends) is up.
Gerardo reports that all three turbos on the main volume tripped last night. Attached trend of PT120B shows pumpdown starting 13:07 PDT yesterday afternoon, pressure starts increasing around 20:45 last night and recovery start 06:14 this morning