TITLE: 07/16 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Outage recovery for most of the day, commissioning work ongoing on IOT2L and HAM7 as of 23:30 UTC.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:09 | FAC | Randy | LVEA | N | HAM3 cleanroom lights | 17:36 |
| 15:42 | FAC | Richard | Ends | N | Power cycle adco chassis | 16:42 |
| 16:03 | SEI | TJ | EndY, EndX | N | Reset hepi vfd | 17:44 |
| 16:32 | PEM | Shrey, Carlos, Miranda | LVEA | N | Seismometer testing | 18:04 |
| 16:43 | SEI | TJ | EndY | N | VFD reset | 17:36 |
| 16:43 | SQZ | Sheila, Cory | LVEA, HAM7 | LOCAL | HAM7 BIFURCATED LASER HAZARD work, sheila out at 18:30 | 19:11 |
| 16:53 | FAC | Randy | LVEA | N | Craning platforms from high bay to west bay | 17:53 |
| 17:02 | SQZ | Rahul | LVEA | LOCAL | Join HAM7 work | 20:10 |
| 17:16 | SEI | Mitch | Ends | N | HEPI health check | 17:45 |
| 17:34 | SQZ | Camilla | LVEA, Vac prep | LOCAL | Check with / join HAM7 crew | 20:17 |
| 18:03 | SEI | TJ | EndY | N | ISI coil driver check, turn on als | 18:50 |
| 18:12 | SUS | Oli | CR | n | Restore SUS pointing | 22:06 |
| 18:25 | PSL | Jennie | LVEA | N | Open up light pipe, psl | 18:33 |
| 18:35 | SEI | Shoshana | LVEA | N | Connect cable by HAM3 | 18:46 |
| 18:45 | EE | FIl | LVEA | N | Check interlock cabling by HAM1 | 19:02 |
| 18:49 | SQZ | Sheila | LVEA | LOCAL | Talk with Camilla | 19:11 |
| 19:02 | CDS | Dave | EndX, then Y | N | Recover long range dolphin | 19:42 |
| 19:03 | CDS | Daniel | CER | N | Timing error investigation | 19:46 |
| 18:09 | SUS | Ibrahim | LVEA | N | Bier garten wrap and bag | 19:22 |
| 19:36 | FAC | Randy | LVEA | N | Clean up around the LVEA | 20:06 |
| 19:53 | VAC | Travis | LVEA | N | Disconnect anulus pump by HAM3 | 20:06 |
| 20:06 | SEI | Shoshana | LVEA | N | CRS work | 20:20 |
| 20:10 | ISC | Keita, Jennie, Fil | LVEA | N | Enable pico motors, heaters, and HV, Fil out 20:20 | 20:25 |
| 20:12 | SEI | Shrey, Carlos, Miranda | LVEA | N | Pickup equipment cases | 20:32 |
| 20:23 | CDS | Dave | EndX | N | Power cycle timing GPS chassis | 20:51 |
| 20:25 | VAC | Travis | LVEA | N/LOCAL | HAM5/7 relay tube | 22:03 |
| 20:41 | SUS | Ibrahim | LVEA | N | Wrap bag and tag, Bier garten | 21:33 |
| 20:51 | FAC | Randy | LVEA | N | Cleaning | 21:40 |
| 20:51 | VAC | Gerardo | LVEA | N/LOCAL -> Y | Relay tube work | 22:12 |
| 21:30 | PSL | Jennie | LVEA | N | Reenergize rotation stage | 21:47 |
| 21:35 | SAF | Richard | LVEA | N/LOCAL | Talk to Travis | 22:00 |
| 21:40 | SEI | Shoshana | LVEA | N | Turn on CRS laser | 21:49 |
| 21:46 | SQZ | Camilla, Madi | Optics lab | N | CHETA optics, lens work, Camilla out at 22:30 | 22:40 |
| 21:54 | OPS | RyanS | LVEA | N -> Y | Laser hazard transition | 22:05 |
| 22:04 | TCS | Matt, Cory | Prep/CHETA lab | N | CHETA work, Cory out 22:20 | 23:04 |
| 22:08 | ISC | Jennie, Elenna | LVEA | Y | Table work, IOT2L MC refl beam. Jennie out 22:40 | 00:08 |
| 22:15 | SUS | Ibrahim | LVEA | Y | Wrap bag and tag | 22:56 |
| 22:27 | VAC | Travis | LVEA | Y | Check on pumps | 22:34 |
| 22:27 | SUS | Rahul, Camilla, RyanS | LVEA | Y | ZM5 aligment, HAM7 work. Camilla in at 22:40, RyanS out at 23:30 | 00:27 |
| 22:46 | HWS | TJ | LVEA | Y | Investigate HWS | 23:21 |