TITLE: 07/16 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 10mph Gusts, 5mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY: The LVEA is currently Laser HAZARD while alignment work is happening on IOT2L and SQZT7. Power outage recovery today is essentially finished and recovery of the IFO begins.